Exhibition stand setting-out plan: what it shows and why

3 min readUpdated By the ExhibitionBase Studio team
Exhibition stand setting-out plan: what it shows and why: a stand designed and rendered in ExhibitionBase Studio

In short

A setting-out plan tells the build crew exactly where each wall, counter and column goes on the hall floor. It works from one fixed reference, usually a corner of the plot, and gives running dimensions along a grid. The crew marks these on the floor before anything is built. A good sheet removes guesswork on a tight build-up, and it stops the small errors that end with a stand overhanging an aisle.

Key points

  • Every dimension runs from one fixed reference point.
  • Running dimensions stop small errors adding up.
  • Check the plot against the hall before you mark out.
  • It differs from a general arrangement, which shows the whole design.

What goes on the sheet

ItemWhy it is there
Datum pointThe fixed corner that all dimensions run from
GridLetters and numbers, so crew members can refer to a position by phone
Running dimensionsMeasured from the datum, so that errors do not accumulate
Wall linesThe face of each wall, with its thickness shown
Fixed itemsColumns, hall services and floor boxes on the plot
North or aisle markerSo the sheet is turned the right way on site
Sheet layouts vary, but these items answer most site questions.

Why running dimensions matter

If a drawing says 2.4 m, then 1.2 m, then 3 m, each small error on the tape is added to the next. A running dimension says 2.4 m, 3.6 m and 6.6 m from the same zero, so an error stays where it happened. That is the main difference between a setting-out plan and a dimensioned plan drawn for a client.

It also makes checking easy. A site manager can measure one long dimension and know whether the wall is right, without re-measuring the whole line.

Using it on site

  1. 01

    Confirm the plot

    Check the organiser's floor marks against your contracted plot and neighbours.

  2. 02

    Find the datum

    Agree which corner is zero, and mark it clearly on the floor.

  3. 03

    Mark the walls

    Tape or chalk out wall lines before the first panel arrives.

  4. 04

    Check the diagonals

    Measure both diagonals. If they match, the plot is square.

  5. 05

    Note hall obstacles

    Columns and floor boxes may not be where the plan shows them. Report them straight away.

A setting-out plan from the 3D model

Studio's drawing pack includes a setting-out plan drawn from the 3D model, with dimensions from the front-left corner of the stand in millimetres. Because it comes from the model, it updates when the layout changes.

It is a concept drawing, so your builder should check it against the hall and their own construction. Editing and drawing export are free once a design exists; a new design costs 5 credits, and new workspaces get 5 free credits.

A peninsula stand with rooms along its back wall
Rooms and walls like these all need a position on the setting-out plan. Designed and rendered in Studio.

Frequently asked questions

What is a setting-out plan?

A drawing that gives the crew the position of everything on the floor, using dimensions from one reference point.

Is it different from a floor plan?

Yes. A floor plan shows the layout, while a setting-out plan is built for marking it on the ground.

Do small stands need one?

A simple dimensioned plan is often enough at 9 m², but anything with walls or platforms benefits from one.

What is a datum point?

The single fixed point all the dimensions are measured from, usually one corner of the plot.

Put it into practice

Exhibition stand technical drawings, drawn from the 3D design

A3 plan and elevations at scale, set-out grid, object schedule and a layered AutoCAD DXF, generated from the 3D design.

Guidance here reflects common practice. Venues, organisers and countries set their own rules: always check the exhibitor manual and work with a qualified stand builder and engineer for structures.

Your next stand

Design the stand before the client asks twice.

Start with 5 free credits: enough for a complete AI stand design. Editing, drawings and exports are always free.