3 min readUpdated By the ExhibitionBase Studio team
transport logistic stand design: what works for this audience: a stand designed and rendered in ExhibitionBase Studio

In short

transport logistic is a major European logistics fair, where forwarders, carriers, ports and software firms meet customers and each other. Few exhibitors have a physical product, so stands depend on meeting space, network maps and live data. Hospitality often drives more value than display. Start a custom stand about 6–9 months ahead and confirm dates, height limits and rules in the exhibitor manual.

Key points

  • Where and when: Munich, every two years in Munich, in odd years.
  • The audience is mostly shippers.
  • Lots of meeting tables.
  • A clear network map.
  • Plan a custom stand about 6–9 months before the show.

transport logistic for exhibitors

Ports, airlines, rail firms and software suppliers exhibit, and national and regional pavilions are common. Many stands hold a large number of scheduled meetings across the fair.

transport logistic
CityMunich
VenueMesse München
SectorLogistics, mobility and supply chain
CycleEvery two years in Munich, in odd years
Main stand activityPre-booked meetings
Custom stand lead time6–9 months
transport logistic at a glance. Always confirm the current edition's dates and venue with the organiser.

Who you are designing for

Shippers, forwarders, carriers, port authorities and logistics IT buyers.

What matters most on a transport logistic stand:

  • Lots of meeting tables.
  • A clear network map.
  • Evening hospitality.
  • Software with real shipment data.

Layouts for pre-booked meetings, by stand type

Most transport logistic exhibitors build around pre-booked meetings. How that works depends on how many sides of your plot are open. If you are unsure which type you have, see exhibition stand types.

Stand typeOpen sidesWhat works
Row (inline)1A welcome counter at the front and two bar tables; book longer meetings in the venue's meeting rooms.
Island4Meeting rooms in a central core or on an upper deck, with reception and a short demo on the busiest aisle.
Starting layouts for a transport logistic stand.
A stand layout suited to transport logistic, rendered in 3D
A pre-booked meetings layout of the kind that suits transport logistic, built from a Studio template. Designed and rendered in Studio.

Stand ideas for transport logistic

  • A live map of routes.
  • A shared-meeting concierge for ports.
  • A container used as a meeting room.

Planning, approvals and logistics

Hospitality needs catering orders and storage. If you bring a real container, plan route, floor load and approval.

Allow about 6–9 months for a custom stand. The exhibitor manual sets height limits, open-side rules and service deadlines; see venue approval and technical drawings.

Where the budget goes at transport logistic

Catering and meeting space usually outrank structure. If you share the stand, agree who pays what in writing.

Mistakes we see at transport logistic

  • A stand that is all screens with no place to sit.
  • Generic globes and containers with no claim.

An example transport logistic brief

A 9 × 6 m corner with a live route map, eight meeting tables, a bar for evening networking and a booking desk.

Replace the size and the zones with your own. The plot and height limit come from your contract and the exhibitor manual.

Try your transport logistic layout in 3D

ExhibitionBase Studio turns your plot size, open sides and a brief about pre-booked meetings into an editable 3D stand for 5 credits, renders it and exports a plan for your builder. New workspaces get 5 free credits.

Frequently asked questions

How often is transport logistic held?

Every two years in Munich, in odd years.

What do logistics companies show?

Their networks, software and service, usually with meetings as the main activity.

How early should I start designing a transport logistic stand?

For a custom stand, about 6–9 months ahead: long enough for design, organiser approval, production and shipping. Shell scheme stands can be planned in weeks.

Can I reuse my transport logistic stand at other shows?

Often, if it is modular. Design the core (walls, counters, pre-booked meetings area) to work on several plot sizes, and swap graphics per show. See [modular vs custom stands](/guides/modular-vs-custom-exhibition-stands).

Put it into practice

From a client brief to a 3D stand concept in minutes

An editable 3D exhibition stand concept from a written brief and the brand's website, at your exact size.

Guidance here reflects common practice. Venues, organisers and countries set their own rules: always check the exhibitor manual and work with a qualified stand builder and engineer for structures.