Planning a stand

How to read an exhibitor manual without missing anything

3 min readUpdated By the ExhibitionBase Studio team
How to read an exhibitor manual without missing anything: a stand designed and rendered in ExhibitionBase Studio

In short

Read an exhibitor manual with a pen and a calendar. First pull out every deadline, then your stand's height and open-side rules, build-up and breakdown times, the drawing approval process, fire and safety rules, and the official contractors. Turn each one into a task with an owner. Most expensive problems at shows come from something that was printed in the manual, and that someone read too late.

Key points

  • Extract every deadline first.
  • Find the rules for your exact stand type and hall.
  • List who must use which official contractor.
  • Send the relevant rules to your builder on day one.

What to find first

Look forWhy it matters
Deadlines and order formsRates and approvals depend on them
Stand height and wall rulesThey shape the design
Open-side and back-wall rulesBlank walls may need finishing
Approval processWhat to submit, and when
Build-up and breakdown timesThese set the install plan
Official contractorsWhat you must buy, and from whom
Fire, safety and site requirementsPaperwork needed before you can build
Freight and handlingHow goods reach the stand
Food, sound and demo rulesWhat you can actually do on the stand
Names vary: manual, service kit, exhibitor portal or technical guidelines.

Rules that catch designers out

  • Back walls that face a neighbour must often be plain or finished on both sides.
  • Heights can vary by hall, by aisle and by distance from a boundary.
  • Solid walls along an aisle may be limited to a percentage of the frontage.
  • Rigging points may not exist above your plot.
  • Bare walls above your neighbour's stand may need to be white.

Turn it into tasks

  1. 01

    Make one table

    List each form, its deadline, its price and who owns it.

  2. 02

    Share the design rules

    Send the relevant pages to your builder and designer.

  3. 03

    Mark the calendar

    Set reminders two weeks before each deadline.

  4. 04

    Check again at each stage

    Revisit the rules when the design changes, and check for manual updates.

An island stand with a four-sided LED block
An island's height limit and rigging rules shape the whole design. Designed and rendered in Studio.

If you're showing in the USA

In the US, the document is usually called a service kit, and the general contractor publishes it. It lists rates for labor, drayage, electrical and furniture. See US booth rules and trade show booth cost.

Frequently asked questions

What is an exhibitor manual?

The organiser's guide for exhibitors. It sets out rules, deadlines, forms and contacts for a show.

When do I get the exhibitor manual?

Usually some months before the show, often through an online portal. Ask the organiser if you have not seen it after booking.

What is the most important part?

The deadlines, then the height and construction rules for your stand.

Does my stand builder read the manual?

A good one will, but you are responsible for what happens on your stand. Share it and check they have the latest version.

Put it into practice

From a client brief to a 3D stand concept in minutes

An editable 3D exhibition stand concept from a written brief and the brand's website, at your exact size.

Guidance here reflects common practice. Venues, organisers and countries set their own rules: always check the exhibitor manual and work with a qualified stand builder and engineer for structures.

Your next stand

Design the stand before the client asks twice.

Start with 5 free credits: enough for a complete AI stand design. Editing, drawings and exports are always free.