In short
electronica draws design engineers looking for components, so a stand has to get past marketing fast. Show working reference designs on the bench, give engineers a data sheet and a real person who can answer questions, and organise the stand around applications such as automotive, power or embedded. Start a custom stand about 9–12 months ahead and confirm dates, height limits and rules in the exhibitor manual.
Key points
- Where and when: Munich, every two years in Munich, in even years.
- The audience is mostly hardware design engineers.
- Live reference designs and evaluation boards.
- A clear split by application.
- Plan a custom stand about 9–12 months before the show.
electronica for exhibitors
Component companies use electronica to meet existing customers and to show their roadmap. Many visitors are engineers who already know what they need, and much of the valuable work takes place in pre-booked meetings.
| electronica | |
|---|---|
| City | Munich |
| Venue | Messe München |
| Sector | Electronic components and systems |
| Cycle | Every two years in Munich, in even years |
| Main stand activity | Demonstrations |
| Custom stand lead time | 9–12 months |
Who you are designing for
Hardware design engineers, purchasing teams, distributors and application specialists from automotive, industrial, medical and consumer markets.
What matters most on an electronica stand:
- Live reference designs and evaluation boards.
- A clear split by application.
- Meeting rooms for roadmap discussions under NDA.
- Application engineers on the floor.
Layouts for demonstrations, by stand type
Most electronica exhibitors build around demonstrations. How that works depends on how many sides of your plot are open. If you are unsure which type you have, see exhibition stand types.
| Stand type | Open sides | What works |
|---|---|---|
| Row (inline) | 1 | One demo point at the front edge with a screen behind it and a counter to one side; visitors watch from the aisle and step in. |
| Island | 4 | A hero product or small stage at the centre, demo pods on each face, and a closed core for storage and a meeting room. |

Stand ideas for electronica
- A bench where engineers can probe a live board.
- Application zones named after customer problems, not product families.
- A closed room for confidential roadmap reviews.
Planning, approvals and logistics
Demos are small but sensitive. Plan clean power, a wired network and ESD precautions, and keep spare boards on the stand.
Allow about 9–12 months for a custom stand. The exhibitor manual sets height limits, open-side rules and service deadlines; see venue approval and technical drawings.
Where the budget goes at electronica
Spend on application engineers and demo hardware. Stand height matters less here than at a general trade fair, because engineers arrive with your name on their list.
Mistakes we see at electronica
- A wall of part numbers with no application story.
- Sending only sales staff to a show full of engineers.
An example electronica brief
A 9 × 6 m corner with three application benches for automotive, power and industrial, a distributor counter and a closed four-person NDA room. Boards run on a wired network.
Replace the size and the zones with your own. The plot and height limit come from your contract and the exhibitor manual.
Try your electronica layout in 3D
ExhibitionBase Studio turns your plot size, open sides and a brief about demonstrations into an editable 3D stand for 5 credits, renders it and exports a plan for your builder. New workspaces get 5 free credits.
Frequently asked questions
01How often is electronica held?
Every two years in Munich, in even years. productronica, its production-focused sister fair, runs in the odd years.
02Do electronica stands need meeting rooms?
Most established exhibitors have them, because roadmap talks are confidential. Small exhibitors can use a screened table.
03How early should I start designing an electronica stand?
For a custom stand, about 9–12 months ahead: long enough for design, organiser approval, production and shipping. Shell scheme stands can be planned in weeks.
04Can I reuse my electronica stand at other shows?
Often, if it is modular. Design the core (walls, counters, demonstrations area) to work on several plot sizes, and swap graphics per show. See [modular vs custom stands](/guides/modular-vs-custom-exhibition-stands).
Put it into practice
From a client brief to a 3D stand concept in minutes
An editable 3D exhibition stand concept from a written brief and the brand's website, at your exact size.
Guidance here reflects common practice. Venues, organisers and countries set their own rules: always check the exhibitor manual and work with a qualified stand builder and engineer for structures.